F&B openings stall when kitchen equipment loads, exhaust strategy, drainage, and fire safety are treated as late-stage engineering tasks. By then, architectural commitments leave little room to resolve conflicts without programme impact.

Coordinate loads with equipment intent

Provisional power, water, gas, and heat-rejection assumptions should track the equipment schedule — not a generic per-square-metre allowance.